TS-Topographic Survey, ST-Soil Test, A-Architectural Plan, D-Detail Design, E/M-Electro-Mechanical Design, E/T-Estimate & Tendering, S-Supervision
| 
    Sl. No.  | 
   
    
    Name of
   Project   | 
   
    Name of
   Client  | 
   
    Brief
   Description of Project  | 
   
    Service
   Provided  | 
   
    Project
   Cost  | 
   
    Date  | 
   
    Remarks  | 
  |
| 
    Commence  | 
   
    Completed  | 
  |||||||
| 
   1.  | 
  
   Consultancy
  Services for Design & Drawing, Construction Management and Supervision
  Engineering “Expansion of Cub Scouting in Primary School  (4th Phase)
  Project” (ECSPS - 4th P Project)  (Package:
  D-7/9) Bangladesh Scouts (BS)  | 
  
   Bangladesh
  Scouts (BS)  | 
  
   Consultancy
  Services for Design & Drawing, Construction Management and Supervision
  Engineering “Expansion of Cub Scouting in Primary School (4th Phase) Project”
  (ECSPS - 4th P Project)  (Package:
  D-7/9) Bangladesh Scouts (BS) *Construction of 6 storied Office Building of
  District Scout Bhaban at B. Bariya, Cumilla Region *Construction
  of 10 storied Office Building of District Scout Bhaban at Feni *Construction
  of 6 storied Office Building of District Scout Bhaban at Laxmipur *Extension
  & Renovation works of Existing District Scout Bhaban at Construction
  of 6 storied Office Building of District Scout Bhaban at Narsingdi  | 
  
   TS, ST, A, D, E/M, E/T, S Design  | 
  
   | 
  
   August-2019  | 
  
   On-going  | 
  
   | 
 
| 
   2.  | 
  
   Consulting
  Firm for Construction Works Veterinary public Health
  Service Strengthening and protection project. Department of
  Livestock Services, (DLS) Bangladesh,  Dhaka- 1215.  | 
  
   Department of
  Livestock Services, (DLS)  | 
  
   Construction
  of Site survey, site investigation, Architectural, Structural, Electrical,
  Sanitary design and drawing and full-time supervision of onside Construction
  of VPH & M Lab, Boundary wall, Over Head electrification work in/c 100KVA
  transformer, Internal Road (R.C.C), Deep tube well, pump house and water
  supply line, Land development work, ETP (Effluent Treatment plan) under the
  Saver Dairy Firm, Dhaka.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   | 
  
   June-2020  | 
  
   July-2022  | 
  
   | 
 
| 
   3.  | 
  
   Consultancy
  Services for Construction of 10-Storied Academic Bhaban (About 2,65,000.0 sft.)  | 
  
   Islamic
  University, Kushtia.  | 
  
   Construction
  of Academic Building, Class Room, Teacher Room, Professor Room, Dean Room,
  Conference Room, Library, Auditorium, Examination Hall, Student Common room,
  Toilet Block, Parking, Land escaping etc.   | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 62.0 Crores  | 
  
   June 2019  | 
  
   Design work September-2019  | 
  
   | 
 
| 
   4.  | 
  
   Consultancy
  Services for Construction
  of (a) Meer Mosharraf Hossain Academic Building and
   (b)
  Lalon Shah Hall   | 
  
   Islamic University, Kushtia.  | 
  
   Construction of                             *4-storied
  foundation Academic building with IT- Facilities.   *4-storied
  foundation Lalon Shah Hall (1st Phase: construction
  upto 1st floor) having R.C.C. frame structure
  building with individual footing.  | 
  
  
   Design & Supervision  | 
  
   Tk. 12.00 Crores  | 
  
   January 2003  | 
  
   June - 2005  | 
  
   Completed  | 
 
| 
   5.  | 
  
   Rajshahi
  University, Rajshahi: 6094.16 sqm Consultancy
  Services for Construction of 6-storied Academic Building cum Administration
  Building of Institute of Business Administration (IBA) at Rajshahi.
  1st phase.  | 
  
   Rajshahi University,
  Rajshahi:  | 
  
   Construction of 6-storied Academic Building cum
  Administration Building of IBA at Rajshahi with
  Pile foundation, Electrical & Sanitary works etc. including Master Plan.  | 
  
   TS, ST, A, D, E/M, E/T, S Design   | 
  
   Tk. 13.50 Crores  | 
  
   Dec.- 2010  | 
  
   Dec.- 2017  | 
  
   Completed  | 
 
| 
   6.  | 
  
  Consultancy Services
  for Design & Supervision of 10- Storied Leadership Training Center at Cox’s Bazar
  under Director ate of primary Education.
  Directorate
  of Primary Education.  | 
  
   Directorate
  of Primary Education.  | 
  
  10- Storied
  Training Center Provided with IT Facilities.
  *Training
  Hall (24 Nos) *Computer
  Lab (4 Nos) *Library
  & IT Facilities Room (4 Nos)  *Mat
  Foundation, 4- Lift, Sub- station, Generator, Fire-fighting CC TV, Air-
  Conditioning, Electro- Mechanical Works.  | 
  
   TS, ST, A, D, E/M, E/T Design & Supervision.  | 
  
   Tk. 42.00 Crores  | 
  
   December 2014  | 
  
   Construction 95% Completed  | 
  
   Design Completed Construction On going  | 
 
| 
   7.  | 
  
   Consultancy
  Services for Development work/ Construction Building Works.  | 
  
   Patuakhali Science &
  Technology University, Patuakhali:   | 
  
   *Construction
  of Administrative Building (Vertical Extension for 2nd & 3rd floor of
  4-storied Building),  *Construction
  of student’s Hall (Male) (Horizontal Extension),  *Construction
  of Student’s Hall (Female) (Vertical and Horizontal Extension), 1857.34 sqm *Construction
  of BAM Faculty Building,  *Construction
  of CSE Faculty Building,  *Construction
  of University School & College,  *(g) Construction of Pump
  House and Erection of Deep tube well etc.  | 
  
   TS, ST, A, D, E/M, E/T, S Design   | 
  
   Tk. 36.00 Crores  | 
  
   February 2009  | 
  
   May 2016  | 
  
   Completed  | 
 
| 
   8.  | 
  
   Consultancy Services for Chittagong Science
  & Veterinary University, Establishment of Govt. Veterinary College at
  Chittagong under Directorate of Livestock
  Services.  | 
  
   Establishment of Govt. Veterinary College at
  Chittagong, Ministry of Fisheries & Live- stocks.  | 
  
   The
  College complex consist of the following construction works: 1.
  Construction of 6- storied Govt. Veterinary College, Academic Building Block
  "A". 2.
  Construction of 6- storied Veterinary College, Academic Building Block
  "B". 3.
  Construction of Hostel Building. (4- Storied) Boys. 4.Professor's,
  Associate Professor's Quarter & Vice Principal Quarter (with foundation) 5.
  Assistant Professor's Quarter & Lecturer Quarter (with foundation). 6.Construction
  of Ladies Hostel Building (3- Storied) 7.
  Construction of Auditorium Building. 8.3rd
  Class & 4th Class Staff Quarter (with foundation) 9.
  Construction of Medical Centre. 10.Construction
  of Veterinary Hospital 11.Construction
  of Mosque 12.Construction
  of Boundary wall 13.Construction
  of Gymnasium building 14.Construction
  of Garage, H.B.B Road 15.Land
  Development,  16.
  Boundary Fencing works. 17.Pump
  house and Sinking of Deep Tube-well 18.
  RCC underground water reservoir & water supply line.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 9.42 Crores  | 
  
   February 1996  | 
  
   June 2002  | 
  
   Financed by  GOB  | 
 
| 
   9.  | 
  
   Consultancy Services for Establishment of Govt.
  Veterinary College at Sylhet under Directorate of Livestock
  Services.  | 
  
   Establishment of Govt. Veterinary College at Sylhet Ministry of Fisheries & Live- stocks.  | 
  
   The
  College complex consist of the following construction works: 1.    Construction of Govt. Veterinary
  College, Academic Building 
  Block "A". 2.    Construction of Veterinary
  College, Academic Building 
  Block "B". 3.    Construction of Hostel Building. 4.    Construction of Professor's
  Quarter (3-storied). 5.    Assistant Professor's Quarter   (2-storied). 6.    Construction of Ladies Hostel
  Building 7.    Construction of Lecturer Quarter. 8.    Construction of Principal Quarter.
   9.    Construction of Mosque  10. Construction of 3rd
  Class & 4th Class Staff Quarter 11. Construction of Gymnasium Building
  (50 Sqm.) 12. Construction of Medical Centre. 13. Construction of H.B.B Road
  (Remaining Part) 14. Construction of Boundary Wall with
  Gate 15. Road & Pond Excavation works. 16. Construction of Pump house &
  Deep Tube-well 17. Protection of Eco Sound of
  Auditorium (200Sqm) & Guard wall beside Pump house with repairing works.  18. Repair & Renovation works for
  Ladies Hostel, Drain & Culvert.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 814 Crores  | 
  
   February 1996  | 
  
   June 2002  | 
  
   Financed by GOB  | 
 
| 
   10  | 
  
   Establishment of National Institute of Livestock
  & Poultry Management and Disease Diagnostic Laboratory Project,  Department of Live- Stock.  | 
  
  Department of Live- Stock.(DLS)
   | 
  
  4 Storied Training Institute with IT Facilities. 2207.00
  sqm
  Boys Hostel,
  Woman Hostel, Staff Quarter etc.  Boys Hostel:
  1541.00 sqm Woman Hostel: 1282.00 sqm/Academic Building Staff
  Quarters: 515.00 sqm  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 33.53 Crore  | 
  
   | 
  
   June 2018  | 
  
   Completed  | 
 
| 
   11  | 
  
   Establishment of  Forest College at Nasirabad, Chittagong under FRMP (Forest Research
  Management Project)  Funded by World Bank.  | 
  
   Forest College at Nasirabad,
  Chittagong under FRMP (Forest Research Management Project)  Funded by World Bank.  | 
  
   The
  work includes the : *Construction of (4-storied Academic/ Educational)
  building with class room, Laboratories, Conference hall, Administrative
  section and other related work. *Construction of 4-storied student hostel, including
  indoor games, dining hall, kitchen etc. *Construction of 4-storied Forest Dormitory *Land Development work, Retaining wall, Boundary wall,
  Water Reservoir & Water supply pump house and Residential building etc.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 5.10 Crores  | 
  
   March 1994  | 
  
   July 1996  | 
  
   Financed by WORLD BANK  | 
 
| 
   12.  | 
  
  Consultancy for detailed
  architectural plan, structural design, estimates, preparation of tender
  documents and top supervision of quality development of education and
  infrastructure development of universities project (1st phase).
   | 
  
  Bangladesh Agricultural University,
  Mymensingh:
   | 
  
  Academic Building with IT Facilities -
  *Agri-Business
  Management Institute Bhaban (upto 1st floor with
  4-storied foundation)  *Agriculture
  faculty bhaban upto
  ground floor for 4 departments (new building with 4-storied foundation),  *New
  administration bhaban (upto
  ground floor with 5-storied foundation) and  *Construction
  of GTI Bhaban (upto ground floor with 4-storied
  foundation)  | 
  
   TS, ST, A, D, E/M, E/T, S Design   | 
  
   Tk. 8.21 Crores  | 
  
   Oct. - 2007  | 
  
   Feb- 2009  | 
  
   Financed by GOB  | 
 
| 
   13.  | 
  
   Consultancy
  for Architectural and Engineering Drawing, Design, Estimate for the (i) Construction of Conference Hall cum Auditorium,         (ii) Construction of Vice-Chancellor’s Banglow (iii) Construction of Fisheries Faculty, (iv)
  Construction of Animal Science Faculty Building.  | 
  
   Bangubandhu Sheikh Mujibur Rahman
  Agricultural University:   | 
  
   (i) Construction of Fisheries Faculty (4-storied) (ii)
  Construction of Animal Science Faculty Building                        (4-storied) with IT Facilities. (iii)
  Construction of Conference Hall cum Auditorium,  (iv)
  Construction of Vice-Chancellor’s Banglow,    | 
  
   TS, ST, A, D, E/M, E/T, S Design   | 
  
   Tk. 4.50 Crores  | 
  
   May 2008  | 
  
   December 2008  | 
  
   Completed  | 
 
| 
   14.  | 
  
   :Construction of Agriculture Museum at Bangladesh   | 
  
   Agriculture University, Mymensingh  | 
  
   Construction of Agriculture Museum  | 
  
   TS, ST, A, D, E/M, E/T, S Design
    | 
  
   Tk. 1.25 Crores  | 
  
   Nov. 1999  | 
  
   Sept. 2003  | 
  
   Financed by GOB  | 
 
| 
   15.  | 
  
   Consultancy
  Services for Development Approx value of the
  Contract:  Strengthening
  Integrated Research Facilities of Bangladesh Sugarcane Research Institute, Ishurdi, Pabna.  | 
  
   Bangladesh
  Sugarcane Research Institute, Ishurdi, Pabna.  | 
  
   Construction
  of the following Building Works: 1)
  Extension of Inspection room at BSRI Head Quarter each floor 250 Sqm, 1st
  floor with 3- Storied foundation. 2) Science
  Building (Auditorium, Science lab, Computer Lab and Library) for lkkhu Gobeshona High School
  (1st floor) with 3- storied foundation. 3)
  Extension (Horizontal) of Training Dormitory at BSRI Head Quarter 1st floor
  Building with 3- storied foundation (Each floor 350 Sqm.) 4) Lab cum
  office building at Head Quarter (Agricultural Engineering Division 2nd floor
  with 3- storied foundation) each floor 450 Sqm. 5)Engineering
  Workshop at Head Quarter (Ground floor with 2- storied foundation)    6)Bio-control Laboratory  | 
  
   TS, ST, A, D, E/M, E/T, S Design  | 
  
   | 
  
   February2015  | 
  
   March-2016  | 
  
   | 
 
| 
   16.  | 
  
   Bangladesh Sericulture
  Research & Training Institute, BSRTI, Strengthening Project,  IDA Credit No. 3004-BD  | 
  
   Bangladesh Sericulture
  Research & Training Institute, BSRTI,  | 
  
   Planning,
  Designing & Managing Construction of the following works: (i) Office Building,
  Staff Quarter, Generator Room, Rearing House, Grainage,
  (ii) Land Development iii) Internal Road  (iv) Fencing and (v) Additional
  (Pump) at Sakua, Boda, Panchagar and (ii) Farmhouse, Silk conditioning house,
  Extension of Research Building, Generator Rooms (2 Nos.), Reeling Shed,
  Rearing House (60M²) (ii) Renovation of Research Building & Other
  Buildings (iii) Drainage (iv) Fencing (v) Land Development at BSRTI Campus, Ghoramara, Rajshahi.  | 
  
   TS, ST, A, D, E/M, E/T, S Design
  & Supervision  | 
  
   Tk. 2.47 Crores  | 
  
   August 2000  | 
  
   July 2003  | 
  
   Financed by WORLD BANK  | 
 
| 
   17.  | 
  
   Bangladesh Krira Shikkha
  Protishtan (BKSP): Establishment of Physical
  Training College at Mymensingh.  | 
  
   Bangladesh Krira Shikkha
  Protishtan (BKSP):  | 
  
   Construction of *4-storied Student Hostel
  building *Principal Residence,
  Sub-station *Land Development.  | 
  
   TS, ST, A, D, E/M, E/T, S Design
  & Supervision  | 
  
   Tk. 2.66 Crores  | 
  
   August 2003  | 
  
   July 2005  | 
  
   Financed by GOB  | 
 
| 
   18.  | 
  
   Establishment
  of Regional Training Centre of BKSP at Dinajpur (2nd Phase) under
  Bangladesh Krira Shikkha Protishtan (BKSP).  | 
  
   Bangladesh Krira Shikkha
  Protishtan (BKSP).  | 
  
   Construction
  of  *Officer’s Quarter & Staff Quarter, *Boundary wall, Road, Surface drain & *Land development etc.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 1.63 Lakh  | 
  
   April, 2003  | 
  
   December 2004  | 
  
   Financed by GOB  | 
 
| 
   19.  | 
  
   Consultancy
  Services for Establishment of Regional Training Centre of BKSP at Sylhet,
  Barisal, Khulna (1st. Phase) and Barisal divisional head quarter"
  Project.  | 
  
   Bangladesh Krira Shikkha
  Protishtan (BKSP).  | 
  
   Construction
  of:  *4-Storied Trainees Hostel Building *4-Storied Administrative Building *5-Storied Officers Quarter *5-Storied Staff Quarter, Gymnasium building *Sub-station, External Electrical works (l.T. Overhead line) with Transformer and Sub-station
  equipment *Installation of 150mm dia
  Deep Tube well, Water supply pipe line and Pump House  | 
  
   TS, ST, A, D, E/M, E/T, S Design  Supervision  | 
  
   Tk. 10.00  Cores  | 
  
   December 2004  | 
  
   December 2008  | 
  
   Financed by GOB  | 
 
| 
   20.  | 
  
   Consultancy
  Services for Construction of Tribal Cultural Institute under Ministry of
  Cultural Affairs.  | 
  
   Construction of Tribal Cultural Institute under Ministry of Cultural
  Affairs.  | 
  
   Construction
  of - *Hostel-cum-Training Centre *Museum-cum-Library, Auditorium Building *Officer’s Quarter, Staff Quarter *Internal Road, Land development and  *External electrification   | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 4.45 Crores  | 
  
   April  2002  | 
  
   June 2005  | 
  
   Financed by GOB  | 
 
| 
   21.  | 
  
   Consultancy Services for Architectural Design
  & Engineering Drawing for up-gradation of Agricultural Training Institute
  (ATI) Project at Sherpur, Gaibandha
  & Daulatpur (Khulna) under DAE.  | 
  
    Department of Agriculture Extension.   | 
  
   Construction
  of (i) 3-storied Academic Building with         4-storied Foundation (ii) 3-stoired
  Boys Hostel with         4-storied
  Foundation (iii) 3-stoired Women Hostel with 4-storied Foundation (iv) Guest
  House (v) Staff  Quarter (vi) Repair
  & Reconstruction of existing Officer’s Quarter, Staff Quarter, Farm godown, Rest House, Boys Hostel, Deep Tube Well with Pump
  House, External Water Supply Pipe Line, External Electrification Work,
  Security & Compound Wall, Internal Road, Drain and Land Development work.  | 
  
   TS, ST, A, D, E/M, E/T, S Design
  & Supervision  | 
  
   Tk. 2109.08 Lakh  | 
  
   April 2009  | 
  
   June 2011  | 
  
   Completed  | 
 
| 
   22.  | 
  
   Consultancy Services for Architectural Design
  & Engineering Drawing for Agricultural Training Institute Rangamati Hill
  Tracts Project under DAE.  | 
  
   DAE.  | 
  
   Construction
  of 3-storied Academic Building, 3-storied Boys Hostel, 2-storied Women
  Hostel, Officers Quarter, Principal Quarter, Staff Quarter, Garage, Poultry
  Shed, Cow Shed, Farm Shed, Machinery Shed, RCC Road, Drain, Irrigation
  Channel, Pond & RCC Ghat, Deep Tube Well,
  Overhead Water Tank, Underground Water Reservoir including Water Supply &
  Pump House, External Electrical with 100KVA Transformer & Land Development.
    | 
  
   TS, ST, A, D, E/M, E/T, S Design
  & Supervision  | 
  
   Tk. 830.53 Lakh  | 
  
   January 2004  | 
  
   June 2006  | 
  
   Completed  | 
 
| 
   23.  | 
  
   Consultancy Services for Strengthening
  Agricultural Extension Services Project under Department of Agriculture
  Extension (DAE)  | 
  
   Department of Agriculture
  Extension (DAE)  | 
  
   Detail
  design, construction supervision of 30 Nos. Upazila
  Training Center, Boundary Wall, Internal Road & Tube Well & Land
  Development work.   | 
  
   TS, ST, A, D, E/M, E/T, S Design
  & Supervision  | 
  
   Tk. 379.51 Lakh  | 
  
   July 2007  | 
  
   December 2009  | 
  
   Completed  | 
 
| 
   24.  | 
  
  Consultancy Services for 
  10- Storied Leadership Training
  Center at Cox’s Bazar under Director ate of primary Education.
  10512.04 sqm  | 
  
   Directorate of
  Primary Education.  | 
  
  Consultancy Service for Construction of 10- Storied
  Training Center Provided with IT Facilities.
  *Training Hall
  (24 Nos) *Computer Lab
  (4 Nos) *Library &
  IT Facilities Room (4 Nos)   | 
  
   TS, ST, A, D, E/M, E/T, S Design   | 
  
   Tk. 42.00 Crores  | 
  
   Dec. - 2014  | 
  
   1st Phase Completed.  January 2018 2nd Phase Construction Going on 90%     | 
  
   Funded by World Bank. / ADB.  | 
 
| 
   25.  | 
  
  Consultancy Services for Construction of 15- Storied
  Building with 2- floor Basement of Head Office Building for Primary
  Education, Directorate at Mirpur- 2, Dhaka, and Funded by ADB.
  Directorate of
  Primary Education.  | 
  
   Directorate of
  Primary Education.  | 
  
   Construction
  of 15-storied Building with 2-Floor Basement of Head Office Building for
  Primary Education,  Total
  Area= 204,000.00 Sft.
  Pile with Mat
  Foundation, Lift, Sub- Station, Generator, Air- Conditioning, Fire- fighting,
  CCTV, Solar Pannel, Electro- Mechanical Works,
  including Conference Hall, Office Furniture etc.   | 
  
   TS, ST, A, D, E/M, E/T, S  | 
  
   Tk.88.00  Crores  | 
  
   December 2014  | 
  
   Design &  Construction of 1st Phase Completed June- 2018 & 2nd Phase construction Going on. 90%  | 
  
   Funded by World Bank. / ADB.  | 
 
| 
   26.  | 
  
   Horticulture Development
  Project (HDP) Funded by ADB Loan No. 1010 BAN (SF), Part-C Horticulture Centre at under Directorate
  of Agriculture Extension (DAE). 14 sites: Mymensingh,
  Jamalpur, Kishoregonj, Rajbari,
  Pachgachia (Feni), Ramgor (Khagrachari), Balakata (Bandarban), Daulatpur (Khulna), Baradi (Meherpur), Tebunia (Pabna), Natore, Kallyanpur (Chapai Nawabgonj), Burirhat (Rangpur) and Rahmatpur
  (Barisal).  | 
  
   Horticulture Development
  Project (HDP) Funded by ADB Loan No. 1010 BAN (SF), Part-C Horticulture Centre at under Directorate
  of Agriculture Extension (DAE).  | 
  
   Construction
  of each site : Total 14 sites 2-storied Office cum
  Training Centre, Dormitory Building, Nursery Shed, Officer’s Quarter, Staff
  Quarter, Garage, Internal Road, Drain, RCC Culvert, Boundary Wall & Gate,
  Guard House, Deep Tube Well including Water Supply Pipe Line, Overhead Water
  Tank, Irrigation Channel, External Electrification Work with 100 KVA
  Transformer, Farm & Machinery Shed, Nursery Quarter  and Land Development Work.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 33.00 Crores  | 
  
   March1994  | 
  
   Sept. 1999  | 
  
   Financed by ADB  | 
 
| 
   27.  | 
  
   Horticulture Research
  Centre Project Funded by Asian Development Bank (ADB) Loan No. 1010 BAN (SF)
  Horticulture Research Centre at Joydebpur under
  Bangladesh Agriculture Research Institute (BARI), Ministry of Agriculture  | 
  
   Bangladesh Agriculture
  Research Institute (BARI), Ministry of Agriculture  | 
  
   Planning, Designing &
  Managing construction of the following works: *2-storied Laboratory cum Research  building with conference hall &
  Library *2-storied field house *Threshing Floor, Nursery shed, Implement shed *Irrigation channel & irrigation facilities *Sub-station,
  Electrification work *Deep tube well and pump house, water reservoir *Internal road, Potter shed, Garage, Godown *Furniture work etc.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 16.00 Crores  | 
  
   February 1992  | 
  
   May 1998  | 
  
   Financed by ADB  | 
 
| 
   28.  | 
  
   Consultancy
  Services for Architectural & Engineering Design and Supervision of
  4-Horticulture Training Centre (HTC) under Northwest Crops Diversification
  Project (DAE), Financed by ADB. 4
  Sites: Tebunia (Pabna), Natore,
  Kallyanpur (Chapai Nawabgonj)
  and Burirhat (Rangpur).  | 
  
   Project
  (DAE), Financed by ADB.  | 
  
   Construction
  of each site : Total 4 sites Construction of Functional Building (Extension),
  Dormitory Building (Extension), Cooling Centre, Training Centre, Repair,
  Maintenance & Renovation Work of others existing Building, Construction
  of Boundary Wall, Construction of Internal Road, Culvert and Land Development
  work.  | 
  
   | 
  
   Tk. 704.00 Lakh  | 
  
   March 2004  | 
  
   December 2006  | 
  
   Financed by ADB  | 
 
| 
   29.  | 
  
   Agriculture Research Management Project (ARMP) funded by World Bank,
  IDA Credit No. 2812-BD under Bangladesh Agriculture Research Council (BARC),
  Ministry of Agriculture  | 
  
   Bangladesh Agriculture Research Council (BARC), Ministry of
  Agriculture  | 
  
   Planning, Designing &
  Managing Construction of the following works The Project includes Preparation of Research
  Master Plan & improvement of Research facilities, training facilities
  & residential facilities in various Agricultural Research Institute
  (ARI's) like : BARI,
  BRRI, BFRI, FRI, BLRI, BARC. Construction
  of-
  *Laboratory cum Research Building,  *Training Institute, Farm Development Master Plan,
  Open Channel, Irrigation, Drainage facilities *Construction of Training building,  *Officer's residential building & Staff quarter,  *Sinking of DTW, Water supply, Irrigation etc. *Internal & External Electrification,  *Furniture for Office, Laboratory,  *Conference hall, Training hall, Computer Room
  etc., Boundary wall, Bridge,  Culvert etc.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 40.24 Crores  | 
  
   Nov. 1996  | 
  
   May 2000  | 
  
   Financed by WORLD BANK  | 
 
| 
   30.  | 
  
   Poultry Management Technique Improvement Project
  under Bangladesh Livestock Research Institute (BLRI) at Savar, Dhaka.  | 
  
   Bangladesh Livestock Research Institute (BLRI)
  at Savar, Dhaka.  | 
  
   Planning, Designing &
  Managing Construction of the following works at BLRI Compound Savar, Dhaka: SITE : SAVAR  *Office building training
  room & store room  *Construction of Laboratory
  (Feed Analysis)  *Construction of Feed
  Formulation  *Construction farmers
  Training House  *Construction of Garage  *Construction of box
  culvert with H.B.B road (2nd Phase). *Construction of Internal
  Road & Gate house  *Construction of External
  Electrical work. *Construction of wire
  fencing (around the poultry shed). *Repair &
  renovation work of Poultry duck shed & brooding shed.  | 
  
   TS, ST, A, D, E/M, E/T, S Design & Supervision  | 
  
   Tk. 3.10  Crores  | 
  
   | 
  
   June 2001  | 
  
   JICA  | 
 
| 
   31.  | 
  
   Consultancy services for construction of
  different buildings of the project development of physical facilities for
  strengthening (BARD) Bangladesh Rural Development Comilla.  | 
  
   Bangladesh Rural Development Comilla.  | 
  
   Construction
  of – *1-Storied Hostel
  Building 814.11 sqm *BARD
  International Auditorium 
  655.21 sqm *Cottage
  at Nilachal Hill 287.17 sqm *Conference
  room at BARD *BARD
  women’s Hostel *Three
  storied BARD International Hostel  *Computer-cum-Information
  Technology Building with all modern facilities  *Auxiliary
  three storied 6 unit Building x 2 constructions Shisu Bitan BARD Primary
  School.  | 
  
   TS, ST, A, D, E/M, E/T, S Design
  & Supervision  | 
  
   Tk. 13.00 Crores  | 
  
   August 2007  | 
  
   | 
  
   Completed  | 
 
                    Construction of 6-storied Academic Building cum Administration Building of IBA at Rajshahi with Pile foundation, Electrical & Sanitary works etc. including Master Plan. 
  6094.16 sqm Consultancy Services for Construction of 6-storied Academic Building cum Administration Building of Institute of Business Administration (IBA) at Rajshahi.  (1st phase). 
 Planning, designing, survey, Inventory, Architectural design, Structural design, Preparation of estimate, Specification, Tender Document and Construction management, Construction supervision, Quality control, testing of materials, Payment certificate, Liaison with the authority, progress report etc. Overall responsibility of successful implementation of the project.
                    Construction of 10-Storied Academic Bhaban (About 2,65,000.00sft. Islamic University, Kushtia. 
Planning, designing, survey, Inventory, Architectural design, Structural design, Electro-Mechanical Design, fire-fighting, Lift, Sub-station & Water Supply & Plumbing design, Preparation of estimate, Specification, Tender Document and Construction management, Construction supervision, Quality control, testing of materials, Payment certificate, Liaison with the authority, progress report etc.  Overall responsibility of successful implementation of the project.