TS-Topographic Survey, ST-Soil Test, A-Architectural Plan, D-Detail Design, E/M-Electro-Mechanical Design, E/T-Estimate & Tendering, S-Supervision
Sl. No. |
Name of Project |
Brief Description of Project |
Project Cost |
Staff Deployed |
Date |
Remarks |
|
Commence |
Completed |
||||||
1. |
Consulting Firm for Construction Works Veterinary public Health Service Strengthening and protection project. Department of Livestock Services, (DLS) Bangladesh, Dhaka- 1215.
|
Construction of Site survey, site investigation, Architectural, Structural, Electrical, Sanitary design and drawing and full-time supervision of onside Construction of VPH & M Lab, Boundary wall, Over Head electrification work in/c 100KVA transformer, Internal Road (R.C.C), Deep tube well, pump house and water supply line, Land development work, ETP (Effluent Treatment plan) under the Saver Dairy Firm, Dhaka. |
Tk. 2073910Lakh |
Architect Sr. Structural Engr. Electrical Engineer Service Engineer Site Engineer
Design & Supervision |
June 2020 |
July-2022 |
Financed by GOB |
2. |
Establishment of National Institute of Livestock & Poultry Management and Disease Diagnostic Laboratory Project
Client: Department of Live- Stocks Services (DLS) |
Construction of *4-storied Administrative & Academic Building (With 5- Storied Foundation), 4- Storied Boys Hostel Building (With 4- Storied Foundation), 4- Storied Ladies Hostel Building (With 4- Storied Foundation), 5- Storied Officers Dormitory Building (With 5- Storied Foundation), 5- Storied Staff Dormitory Building (With 5- Storied Foundation), 2- Storied FDIL Building (With 4- Storied Foundation), 2- Storied Principal cum PSO Quarter with 2- storied foundation, 1- Storied Mosque with 1- storied foundation, 1- Storied Veterinary Clinic Building with 1- storied foundation, 1- Storied Cattle Shed with 1- storied foundation, 1- Storied Poultry Shed, 1- Storied Goat shed, 1- Storied Sheep shed, 1- Storied Insinuator House, Deep-tube well with Pump House, Water Supply Pipe Line, Underground Water Reservoir, External Electrification Works with 300 KVA Sub-Station, Boundary Walls, Main Gate, Guard House, Internal RCC Road, Master Drain & Land Development work.
|
Tk. 3312.70 Lakh |
Architect Sr. Structural Engr. Electrical Engineer Service Engineer Site Engineer
Design & Supervision |
March 2014 |
June 2018 |
Financed by
GOB |
3. |
Beef Cattle Development Project
Client: Department of Live- Stocks Services (DLS) |
Construction of – *1-storied Bull Shed with run,- 3Nos., 1-storied Calf Shed with run,- 6Nos., Boundary Walls, Internal RCC Road, Master Drain, Water Supply Pipe Line, External Electrification Works & Land Development work.
|
Tk. 663.07 Lakh |
Architect Sr. Structural Engr. Electrical Engineer Service Engineer Site Engineer
Design & Supervision
|
August 2014 |
June 2018 |
Financed by
GOB |
4. |
Livestock Disease Prevention & Control Project
Client: Department of Live- Stocks Services (DLS |
Construction of – *2-Storied Office Cum Dormitory Building (with 3- Storied Foundation), Animal Isolation Shed, Boundary Wall, In/c Gate, Internal Road, Drain & Apron, Land Development Work, Tub Well, Water Supply Line, & Electrification work etc. at Kamalpur Land Port, Jamalpur, Bibirbazar Land Port, Comilla, Akhaora Land Port, Brahmmanbaria, Taknaf Land Port, Cox Bazar, Chittagong Sea port, Belunia Land Port, Feni, Burimari Land Port, Lalmonirhat, Banglabond Land Port, Panchagoar, Hilly Land Port, Dinajpur, Sonamasjid Land Port, Chapainababgong, Rohnopur Land Port, Chapainababgong, Benapol Land Port, Jessore, Bhomra Land Port, Satkhira, Darshona Land Port, Chuadanga, Mongla Sea Port, Bagerhat, Tamabil Land Port, Sylhet, Bituli Land Port, Mowlobi Bazar, Zokigonj Land Port, Sylhet, Sutarkandi Land Port, Bianibazar, Sylhet.
Total Site= 20 Nos. Each Site |
Taka- 3585.23 Lakh.
|
Architect Sr. Structural Engr. Electrical Engineer Service Engineer Site Engineer
Design & Supervision
|
September 2013 |
June 2017 |
Financed by GOB |
5. |
Establishment of Regional Duck Breeding Farm alone with Hatchery (3rd Phase). |
Construction of – *2-storied Office, Training cum Officers Quarter – 10 nos., 2-storied Brooder shed with run–10 nos., 4-storied Dormitory Building–10 nos., Grower shed with run–10 nos., Layer shed with run–59 nos., Hatchery Building–10 nos., Godown– 10 nos., Garrage–10 nos., Including, Deep-tube well with Pump House, Water Supply Pipe Line, External Electrification Works with 50 KVA Transformer, Boundary Walls I/nc Gate, Internal RCC Road, Master Drain & Compound Drainage, Disposal Pit, Carcas Pit & Land Development work Duck Hatchery Farm at Kishorgonj, Madaripur, Bagerhat, Patuakhali, Bhola, Nilphamari, Kurigram, Sirajgong, Gopalgonj & Nasirnagor, B-Baria. *2-storied Brooder shed with run– 4 nos., 2-storied Dormitory Building–4 nos., Grower shed with run–4 nos., Layer shed with run–20 nos., Hatchery Building–4 nos., Repair & Renovation work of existing 2- storied Office cum residential building- 3 Nos., Godown– 4 nos., Garrage–4 nos., Including, Deep-tube well with Pump House, Water Supply Pipe Line, External Electrification Works with 50 KVA Transformer, Boundary Walls I/nc Gate, Internal RCC Road, Master Drain & Compound Drainage, Disposal Pit, Carcas Pit & Land Development work Duck Hatchery Farm at Mymensingh, Netrokona Magura, & Hobigonj. *Repair & Renovation work of existing 2- storied Office cum residential building, Grower shed with run, Brooder shed with run, Boundary wall In/c gate, Internal RCC Road, Deep-tube well, External Electrical Work and Land development work of Duck rearing unit at Jhalokathi.
Total Site= 14 Nos.
|
Tk. 13,282.10 Lakh |
Architect Sr. Structural Engr. Electrical Engineer Service Engineer Site Engineer
|
May 2012 |
June, 2018 |
Financed by
GOB |
6. |
Avian Influenza Preparedness and Response Project (AIPRP) [ Loan # IDA Credit Cr. 4340-BD] |
Construction / Reconstruction of (i) One Live Bird Section (ii) Two Demostration Poultry Farms at Different Location of Boro Bazar at 09 (Nine) District. |
Tk. 928.21 Lakh |
Architect Sr. Structural Engr. Electrical Engineer Service Engineer Site Engineer
|
January 2012 |
December 2012 |
Financed by
World Bank |
7. |
Consultancy Services for Establishment of Regional Duck Breeding Farm along with Hatcheries (2nd Phase) under Department of Livestock Services (DLS) |
3-storied Office, Training cum Manager Quarter – 3 nos. 2-storied Brooder shed with run-3 nos. 2-storied Dormitory building-3nos. Grower shed with run- 6 nos, Layer shed with run-18 nos, Hatchery building-3, Godown-3 nos, Garrage-3 nos. including, Deet-tube well, External Electrical Wrosk, Boundary walls, Internal Roads, Drains, Carcas Pit & Land Development work of Duch Hatchery Farm at Barisal, Rangamati, Sunamganj.
2-storied Office cum residential building – 5 nos, Grower shed with run-5 nos, Brooder shed with run-5nos, Dormitory building-5nos, including shallow-tube well, External Electrical works, boundary walls, internal roads, drains & land development work of duck rearing unit at Jhalokathi, Magura, Mymensingh, Netrokona & Hobiganj.
Brooder shed with run-9 nos, Running Poultry Farm at Patuakhali, madaripur, Gopalganj, Bagerhat, Jamalpur, Kishoreganj, Noakhali, Sirajganj & Kurigram.
|
Tk. 2429.75 Lakh |
|
June 2009 |
|
|
8. |
Establishment of Govt. Veterinary College at Chittagong under Directorate of Livestock Services.
|
The College complex consist of the following construction works: 1. Construction of Govt. Veterinary College, Academic Building Block "A". 2. Construction of Veterinary College, Academic Building Block "B". 3. Construction of Hostel Building. 4. Professor's, Associate Professor's Quarter & Vice Principal Quarter (with foundation) 5. Assistant Professor's Quarter & Lecturer Quarter (with foundation). 6. Construction of Ladies Hostel Building 7. Construction of Auditorium Building. 8. 3rd Class & 4th Class Staff Quarter (with foundation) 9. Construction of Medical Centre. 10. Construction of Veterinary Hospital 11. Construction of Mosque 12. Construction of Boundary wall 13. Construction of Gymnasium building 14. Construction of Garage, H.B.B Road 15. Land Development, 16. Boundary Fencing works. 17. Pump house and Sinking of Deep Tube-well 18. RCC underground water reservoir & water supply line.
|
Tk. 9.42 Crores |
|
February 1996 |
June 2002 |
Financed by GOB |
9. |
Establishment of Govt. Veterinary College at Sylhet under Directorate of Livestock Services. |
The College complex consist of the following construction works: 1. Construction of Govt. Veterinary College, Academic Building Block "A". 2. Construction of Veterinary College, Academic Building Block "B". 3. Construction of Hostel Building. 4. Construction of Professor's Quarter (3-storied). 5. Assistant Professor's Quarter (2-storied). 6. Construction of Ladies Hostel Building 7. Construction of Lecturer Quarter. 8. Construction of Principal Quarter. 9. Construction of Mosque 10. Construction of 3rd Class & 4th Class Staff Quarter 11. Construction of Gymnasium Building (50 Sqm.) 12. Construction of Medical Centre. 13. Construction of H.B.B Road (Remaining Part) 14. Construction of Boundary Wall with Gate 15. Road & Pond Excavation works. 16. Construction of Pump house & Deep Tube-well 17. Protection of Eco Sound of Auditorium (200Sqm) & Guard wall beside Pump house with repairing works. 18. Repair & Renovation works for Ladies Hostel, Drain & Culvert.
|
Tk. 8.14 Crores |
|
February 1996 |
June 2002 |
Financed by GOB |
11 |
Conversion & Modernization of Existing Dairy Farm at Rajshahi, Sylhet, Faridpur into Cattle Breeding Farms under Directorate of Livestock Services.
|
The construction works includes the followings; A. Rajshahi Dairy Farm : 1. Construction of 2-storied A.I. laboratory building, Director’s office & Inspection Bunglow etc. 2. Const. of Feed Godowns & Feed mixing building 3. Construction of chow shed – 4 units 4. Construction of semi pucca shed 5. Construction of semi pucca Bull-shed 6. Construction Calf shed 7. Construction of Calf pan – 1 unit 8. Construction of Agriculture Equipment store bldg. 9. Construction of open padock shed 10. Construction of combined drain 11. Construction of plinth protection & surface drain 12. Construction of Manure pit 13. Installation & Commissioning of 150mm dia deep tube well, Land Development 14. Construction Internal carpeting & H.B.B. Road 15. Construction of Generator house 16. Construction Bio-Gas Plant B. Faridpur Dairy farm: 1. Construction of Agriculture equipment store bldg 2. Const. of Feed Godowns & Feed mixing building 3. Construction of semi pucca shed 4. Construction of boundary wall 5. Construction of calfpan 6. Construction of maternity shed 7. Construction of surface drain 8. Construction of open padock 9. Construction of cow-dung pit 10. Land development 11. Construction of Internal carpeting & H.B.B. Road 12. Construction of Irrigation drain 13. Construction of plinth protection & surface drain 14. Installation & Commissioning of 150mm dia deep tube well 15. Construction of Generator house 17. Construction Bio-Gas Plant. Sylhet Dairy farm : 1. Construction of Feed Godowns & Feed mixing building 2. Construction of cow dung pit 3. Construction of Dam with low lift pump 4. Construction of Generator house
|
Tk. 5.00 Crores |
|
June 2000 |
|
|
12. |
Poultry Management Technique Improvement Project under Bangladesh Livestock Research Institute (BLRI) at Savar, Dhaka.
|
Planning, Designing & Managing Construction of the following works at BLRI Compound Savar, Dhaka: SITE : SAVAR · Office building training room & store room · Construction of Laboratory (Feed Analysis) · Construction of Feed Formulation · Construction farmers Training House · Construction of Garage · Construction of box culvert with H.B.B road (2nd Phase). · Construction of Internal Road & Gate house · Construction of External Electrical work. · Construction of wire fencing (around the poultry shed). · Repair & renovation work of Poultry duck shed & brooding shed.
|
Tk. 3.10 Crores
|
|
June 2001 |
|
|
13. |
Establishment of Rearing Unit for Goat Development (Goat farm) in Each Division under Directorate of Livestock Services |
Planning, Designing & Managing Construction of the following works in different Goat farms: SITE : SAVAR GOAT FARM, DHAKA · Construction of Quarter for A.D & L.O., · Construction of Barrack, · Construction of Office-cum-godown, · Construction of Goat shed 6 nos. · Construction of Maternity shed, · Construction of Isolation shed for Goat, · H.B.B. road, · Installation of Tube-well, · Over-head electric line, · Land development and boundary wall etc.
|
Tk. 5.00 Crores |
|
Dec. 1997 |
|
|
|
|
SITE : SYLHET GOAT FARM · Construction of Quarter for A.D & L. O. quarter, · Construction of Barrack, · Construction of Office cum godown, · Construction of Goat rearing shed, · Construction of Maternity shed, · Construction of Isolation shed, · Construction of Boundary wall, · Installation of Tube-well, · Over head electric line and · Land development works etc.
SITE : RAJSHAHI GOAT FARM · Goat shed, Land development & Boundary wall etc.
|
|
|
|
|
|
|
|
SITE : CHUADANGHA GOAT FARM · Construction of Goat rearing shed, · Construction of Quarter for A.D & L.O. quarter, · Construction of Barrak, · Construction of Office cum godown, · Construction of Maternity shed, · Construction of Isolation shed, · H.B.B. road, Construction of Boundary wall, · Installation of Tube-well, · over head electric line, · Land development etc. |
|
|
|
|
|
|
|
SITE: JHANIDHA GOAT FARM · Construction of Goat farm shed, · Construction of Office building, · Land development, · Installation of Tube-well, · Over head electric line etc. |
|
|
|
|
|
14. |
Small Holder Livestock Development Project under DLS Funded by IFAD, Loan-280 (B.A). Ministry of Fisheries & Livestock |
Construction of Hatchery & Poultry farm at different Districts under Directorate of Live-stock Services (DLS) 1. Construction of Hatchery Building at Kurigram 2. Construction of Hatchery Building at Satkhira 3. Construction of Hatchery Building at Gopalpur 4. Construction of Hatchery Building at Manikgonj 5. Construction of Hatchery Building at Gopalgonj 6. Construction of Hatchery Building at Jamalpur 7. Construction of Hatchery Building at Bogra 8. Construction of Hatchery Building at Rangpur 9. Construction of Poultry Shed at Rangpur 10. Construction of Poultry Shed at Kushtia 11. Construction of Poultry Shed at Jamalgonj 12. Construction of Poultry Shed at Jessore 13. Construction of Poultry Shed at Sitakunda 14. Construction of Boundary wall, brooder shed, office Bhaban, dress room etc. at Sitakunda 15. Construction of Road at Sitakunda 16. Repairing works of different Poultry sheds at Pabna 17. Construction of Semi-pacca Poultry shed at Pahartali 18. Construction of Poultry shed at Pahartali 19. Construction Semi-pacca Poultry shed at Mirpur 20. Repairing of works of different poultry sheds, Group-A at Mirpur 21. Repairing of works of differfent poultry sheds, Group-B at Mirpur 22. Repairing of works of different poultry sheds at Jamalgonj 23. Construction of Boundary wall at Jamalgonj 24. Repair of works of different poultry sheds at Noakhali 25. Repair of works of different poultry sheds at Comilla 26. Construction of Road at Sitakunda 27. Construction of boundary wall at Jessore 28. Repair of works of different poultry sheds at Tangail 29. Construction of Boundary wall at Manikgonj 30. Repair of works of different poultry sheds at Jessore 31. Construction of Generator house & Installation of generators at Manikgonj, Satkhira, Gopalgonj & Jamalpur.
|
Tk. 3.30 Crores |
Architect Sr. Structural Engr. Electrical Engineer Service Engineer Site Engineer
|
December 1991 |
May 1997 |
|
15. |
Consultancy Services for Development and Testing of Livestock Technologies for Employment and Poverty Alleviation Programme under Bangladesh Livestock Research Institute (BLRI) |
· · Construction of Administrative-cum-Library Building · Residential Building · Animal Sheds · Poultry Shed for Research Farm · Connecting Road & boundary Wall · Electricity · Gas Line and Accessories etc.
|
Tk. 5.50 Crores |
|
January 2008 |
|
|
17. |
Country wide Fodder Cultivation and Extension under DLS, Ministry of Fisheries and Livestock Sites = 100 Nos. |
Development of various infrastructures at Thana Livestock Office compound about 100 sites & Savar Dairy farm. |
Tk. 6.50 Crores |
|
June 1998 |
|
|
18. |
Cyclone affected Rural House hold in coastal area under Directorate of Livestock Services, Ministry of Fisheries and Livestock
|
· Construction of Hatchery building, Generator house, repairing of boundary wall, land development and Installation of sub-station equipment at Pahartoli Poultry farm, Chittagong. · Construction of 2-storied Poultry shed, Office building, Boundary wall, road at Sitakunda Poultry farm · Construction of Poultry shed at Chokoria, Anowara & Bashkhali. |
Tk. 75.00 Lakh |
|
Dec. 1993 |
|
|
Construction of Site survey, site investigation, Architectural, Structural, Electrical, Sanitary design and drawing and full-time supervision of onside Construction of VPH & M Lab, Boundary wall, Over Head electrification work in/c 100KVA transformer, Internal Road (R.C.C), Deep tube well, pump house and water supply line, Land development work, ETP (Effluent Treatment plan) under the Saver Dairy Firm, Dhaka.
More..Total Structural Building: l4 Nos. 2- storied Boys Hostel, 4-Stoired Administrative and Academic Building, 2- Storied Ladies Hostel, 1- Storied Mosque, 1- Storied Incinerator House, 2- Storied FDIL Building, 1- Storied Veterinary Clinic, 1- Storied Cattle Shed, 1- Storied Poultry Shed, 1- Storied Sheep Shed, 1- Storied Goat Shed, 5- Storied Officers Dormitory Building, 5- Storied staff Dormitory Building, 2- Storied Principal Cum PSO Quarter, Boundary wall in/c Gate, Deep Tube well, Water Supply, Pipe line & Pimp House, Drain & Apron, Internal Road & Approach Road, Side Improvement work etc.
More..