Sl. No. |
Name of Project
|
Name of Client |
Brief Description of Project
|
Service |
Project Cost |
Start Date |
Completion Date |
Consultancy Fees |
Remarks |
1 |
Consultancy Services for Detail Structural Design for Construction of Multi-Storied Staff Quarter in Malibag, Rajuk Compound.
|
RAJUK |
Multi-Storied Building with Sanitary, Plumbing & Electrical Works. |
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
|
|
On-going 04-08-2019. |
19,30,400.00 |
|
2 |
Consultancy Services for Construction of 10 – Storied Academic Bhaban (About 2,65,000.00sft. Islamic University, Kushtia.
|
Islamic University, Kushtia. |
Construction of 10 – Storied Academic Bhaban |
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
|
June-2019 |
Design Phase Completed |
55.50 Lakh |
|
3 |
Consultancy Services for Design & Supervision of 17- Storied + 2- Basement of ECE, Academic Building of Bangladesh University of Engineering & Technology (BUET) Dhaka. |
Bangladesh University of Engineering & Technology (BUET) Dhaka. |
17- Storied + 2- Basement of ECE, Academic Building (1000.0 Sft/ Floor Area), at Total Area= 190000.00 Sft. Class Room, Research Room, Laboratory, Library etc. BUET Complex, Palashi, Dhaka. Mat Foundation, Cast- in – Situ Pilling. * Lift, Sub- station, Generator, Fire- fighting, CCTV, Air- Condition System, Solar Panel & BMS- etc.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 100.0 Crores
|
Sept. - 2018 |
Design Phase Completed. |
76.0 Lakh. |
|
4 |
Consultancy Service for Feasibility Study, Detailed Design for 30- Storied + 3- Basement, DUGHO BHABAN of Milk- Vita, at Tejgaon, Dhaka. |
Milk- Vita, Ministry of LGED & Cooperative. |
Construction of 30- Storied + 3 Basement of Dugdho Bhaban,. Total Area= 462,000.0 Sft. Mat Foundation, Cast- in – Situ Pilling. * Lift, Sub- station, Generator, Fire- fighting, CCTV, Air- Condition System, Solar Panel & BMS- etc.
|
TS, ST, A, D, E/M, E/T, S
Design |
Tk. 319.0 Crores
|
|
Design Phase Completed August- 2018 |
50.0 Lakh |
|
5 |
Consultancy Services for Construction of 13-storied Office Building (20-storied foundation with 2-Basement) for BAPEX (BAPEX Bhaban) at Plot No. 4, Kawran Bazar, Dhaka-1215 under Petro Bangla.
|
Petro- Bangla/ BAPEX, Dhaka. |
Construction of- *13-storied building (20-storied foundation) with 2- Floor basement for Parking, *Total Floor Area = 16, 5000.0 Sft /Floor Mat Foundation, Cast- in – Situ Pilling. * Lift, Sub- station, Generator, Fire- fighting, CCTV, Air- Condition System, Solar Panel & BMS- etc.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 70.80 Crores |
|
November - 2014 |
27.61 Lakh |
Completed |
6 |
Consultancy Services for Construction of (13+3= 16 floor Basement) storied building (with 20-storied foundation) Family Planning Services Bhaban at Kawran Bazar, Dhaka under Directorate of Family Planning, Ministry of Health & Family Welfare, GOB.Implementation by Chief Engineer, CMMU, Dhaka.
|
Directorate of Family Planning Ministry of Health & Family Welfare, GOB. |
Construction of- *13-storied building (20-storied foundation) with 3-Floor basement for Parking, *Total Floor Area = 160,000.00 Sft. *Cast in-situ Pile, Rafe Foundation, 4 Nos. Lift, Sub- station, Generator, CC TV, Fire- fighting, Air- Conditioning etc.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 37.75 Crores |
May- 2004 |
October 2014 |
27.38 Lakh |
Completed |
7 |
Consultancy Services for Design & Supervision of 19- storied Commercial Building (17- Floor + 2- basements) at 36 Agrabad, Chittagong under Bangladesh Freedom Fighter Welfare Trust (BFFWT).
|
Bangladesh Freedom Fighter Welfare Trust (BFFWT).
|
*19- storied Commercial Building (17- Floor + 2- basements), Area – 1,70,000.0 sft. Lift, sub-station, generator, fire fighting, aluminum door and window & tilted glass fitting. |
TS, ST, A, D, E/M, E/T
Design & Supervision |
Tk. 24.21 Crores |
May- 2012 |
Design & Supervision Completed
January 2019 |
26.0 Lakh |
Design & Supervision Completed |
8 |
Consultancy Services for Design & Supervision of 28- storied Commercial Building (25- Floor + 3- basement) at 71 Agrabad, Chittagong under Bangladesh Freedom Fighter Welfare Trust (BFFWT).
|
Bangladesh Freedom Fighter Welfare Trust (BFFWT).
|
*28- storied Commercial Building (25- Floor + 3- basement). Area – 1,90,000.0 sft. Lift, sub-station, generator, fire fighting, aluminum door and window & tilted glass fitting. |
TS, ST, A, D, E/M, E/T
Design & Supervision |
Tk. 19.50 Crores |
May- 2012 |
Design & Supervision Completed
January 2019 |
25.40 Lakh |
Design & Supervision Completed |
9 |
Consultancy Services for Construction of 22-storied + 1-Semibasement Office Building with 2-Basement Agrabad, Chittagong under Padma Oil Company Ltd. an Enterprise of Bangladesh Petroleum Corporation Ltd. (BPC)
|
Padma Oil Company Ltd. / Bangladesh Petroleum Corporation Ltd. (BPC)
|
Construction of 23-storied + 1-Semibasement Office Building with 2-Basement Agrabad, Chittagong.
*23- Floor= 230,000.00 Sft. Cast in-situ Pile, Rafe Foundation, 4 NOs. Lift, Sub- station, Generator, CC TV, Fire- fighting, Air- Conditioning etc.
|
S, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk.92.00 Crores |
Sept. - 2001 |
Design Completed June- 2016. |
53.58 Lakh |
Construction work going on |
10 |
Consultancy Services for Establishment of National HRD Center (20-Storied Building with 2-Basement) Project under Department of Public Health Engineering (DPHE), Ministry of LGRD & Co-operatives.
|
Department of Public Health Engineering (DPHE), Ministry of LGRD & Co-operatives.
|
(20-Storied Building with 2-Basement) Project under Department of Public Health Engineering (DPHE), Ministry of LGRD & Co-operatives. Area= 24000.00 Sft. 1st Phase up to 7 – Storied + 2- Basement Completed With Electro- Mechanical Work.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 31.78 Crores (1st Phase) |
|
1st – Phase Construction Completed in June- 2018
Design Completed December- 2014 |
10.0 Lakh |
|
11 |
Consultancy Services for Construction of 15-storied Building with 2-Floor Basement of Head Office Building for Directorate of Primary Education, at Mirpur-2, Dhaka, Funded by ADB.
|
Directorate of Primary Education, Mirpur-2, Dhaka. |
Construction of 15-storied Building with 2-Floor Basement of Head Office Building for Primary Education, Directorate at Mirpur-2, Dhaka, Funded by IDA. Total Area= 204,000.00 Sft. Mat Foundation, 4- Lift, Sub- station, Generator, Fire-fighting CC TV, Air- Conditioning, Electro- Mechanical Works.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk.100.00 Crores |
December 2014 |
* Design Completed December 2017 *Construction work of 1st Phase with + 2-Basement Completed in June 2018 *Tendering for Second Phase Progress. |
150.0 Lakh |
1st Phase Completed.
Funded by ADB |
12 |
Consultancy Services for Design & Supervision of 10- Storied Leadership Training Center at Cox’s Bazar under Director ate of primary Education.Directorate of Primary Education.
|
Directorate of Primary Education. |
10- Storied Training Center Provided with IT Facilities.*Training Hall (24 Nos) *Computer Lab (4 Nos) *Library & IT Facilities Room (4 Nos) *Mat Foundation, 4- Lift, Sub- station, Generator, Fire-fighting CC TV, Air- Conditioning, Electro- Mechanical Works.
|
TS, ST, A, D, E/M, E/T
Design & Supervision.
|
Tk. 42.00 Crores |
December 2014 |
*Design Completed. Dec- 2017
*Construction of 1st Phase going on 2nd Phase Tendering Progress. |
49.0 Lakh |
Funded by ADB |
13 |
Consultancy Services for Design & Supervision of 11- Storied + 2- Basement Building (Annex) for Training Center- Dormitory at Mirpur-2, Dhaka. |
Directorate of Primary Education (DPE). |
*11- Storied + 2- Basement Building at Mirpur-2, Dhaka. *Training Center & Dormitory Building. *Mat Foundation, 4- Lift, Sub- station, Generator, Fire-fighting CC TV, Air- Conditioning, Electro- Mechanical Works.
|
TS, ST, A, D, E/M, E/T
Design & Supervision |
Tk. 90.0 Crores |
June - 2018 |
Design Completed. June- 2018 |
65.0 Lakh |
Design Completed.
|
14 |
Consultancy Services for Construction of 10- Storked + 1- Basement Super Market + Cum- Office Building under Zila- Parishad, Kustia. |
Zila- Parishad, Kustia. |
*Super Market upto 5th floor. *Zila Parishad Office, Auditorium. *Pile foundation 3 Nos. Lift, Fire- fighting Sub- station & Other Electro- Mechanical Works. |
TS, ST, A, D, E/M, E/T
Design & Supervision |
|
|
* Design Completed. Dec- 2017 Construction Work in Progress
|
36.0 Lakh |
Design Completed &
Construction work in Progress.
|
15 |
Consultancy Service for Construction of 12-Storied Commercial Building Cum Market in Dakeshori, Azimpur, Dhaka. |
Dhaka- South City CorporationDhaka. |
Construction of 12-Storied + One Basement Commercial Building Cum Market in Dakeshori, Azimpur, Dhaka.
Pile foundation 3 Nos. Lift, Fire- fighting Sub- station & Other Electro- Mechanical Works.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 40.00 Crores (1st Phase) |
|
Design Completed June 2016 Construction Work in Progress |
64.50 Lakh |
Construction In Progress |
16 |
Consultancy Services for Construction of 17- Storied + 3 Basement Building Complex of Bangladesh Inland Water Transport Corporation (BIWTC) at 5 Dilkusha, Dhaka |
Bangladesh Inland Water Transport Corporation Ministry of Shipping, (BIWTC) |
*17- Storied Building + 3- Basement, Lift, Sub- Station, Generator, Fire- fighting etc. *Area= 140,000.0 Sft. *Pile & Mat Foundation, Lift, Sub- station, Generator, Air- Conditioning, Fire- fighting Plumbing & Electro- Mechanical Works etc.
|
TS, ST, A, D, E/M, E/T
Design & Supervision |
Tk. 40.0 Crores |
|
Design Completed Dec- 2016 |
60.0 Lakh |
|
17 |
Consultancy Services for Construction of 20-storied Market cum Officers Quarter under Ward No.-65 at Dakesshory Road, Azimpur, under Dhaka City Corporation (DCC).
|
Dhaka South City Corporation (DSCC), Dhaka.
|
Construction of 20-storied Market cum Officers Quarter under Ward No.-65 at Dakesshory Road under Dhaka City Corporation (DCC). *Pile & Mat Foundation, Lift, Sub- station, Generator, Air- Conditioning, Fire- fighting Plumbing & Electro- Mechanical Works etc.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 60.0 Crores |
|
Design Completed Dec- 2016 |
42.0 Lakh |
Design Completed |
18 |
Consultancy Services for 20-storied Market, community Centre & Officer’s Quarter’s under Ward No.-62 of Dhaka City Corporation, Dhaka
|
Dhaka South City Corporation (DSCC), Dhaka.
|
20-storied Market, community Centre & Officer’s Quarter’s under Ward No.-62 of Dhaka City Corporation, Dhaka. *Pile & Mat Foundation, Lift, Sub- station, Generator, Air- Conditioning, Fire- fighting Plumbing & Electro- Mechanical Works etc . |
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 45.0 Crores |
|
Design Completed Sep- 2016 |
35.0 Lakh |
Design Completed |
19 |
Consultancy Services for Construction of 10-Storied Building + 1 Basement of PGCB (Power Grid Company of Bangladesh) at Aftabnagar Rampura, Dhaka.
|
Power Grid Company of Bangladeshunder Ministry of Power & Energy. |
Construction of 10-Storied Building of PGCB (Power Grid Company) at Aftabnagar Rampura, Dhaka. Pile foundation, Lift, Sub- station, Fire- fighting, Air- Conditioning. |
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 48.0 Crores |
|
Design Completed Oct- 2018 |
46.08 Lakh |
Design Completed. |
20 |
Consultancy Services for Legal and Judicial Capacity Building Project,Contract Package # S-20, IDA Credit No.3485- BD under Ministry of Law Justice and Parliamentary Affairs.
|
Ministry of Law Justice And Parliamentary Affairs |
Construction of - Judge Court Building Complex at 22- District fitting & fixing etc. Area- 1, 30,000.0 sft.
Pile foundation, Lift, Sub- station, Fire- fighting, Air- Conditioning. |
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 130.25 Crores
|
|
Design Completed July 2006 |
|
Completed |
21 |
Consultancy Services for Preparation of Architectural and Structural Design including Sanitary, Plumbing, Electrical, Mechanical Design, Estimate, Feasibility Study and Tender Document etc. for 10 (ten) Storied Poura Bhaban at 10 Nos. Bangabandhu Road, Narayangonj.
|
Narayangonj City Corporation. |
10 (ten) Storied Poura Bhaban at 10 Nos. Bangabandhu Road, Narayangonj.
Pile foundation, Lift, Sub- station, Fire- fighting, Air- Conditioning. |
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 20.00 Crores |
|
Design Completed June- 2016
|
15.0 Lakh |
Design Completed |
22 |
Consultancy Services for Construction of 10-storied High-rise building of Sadharan Bima Corporation at Mokhali, Dhaka.
|
Sadharan Bima Corporation at Mokhali, Dhaka.
|
Construction of 10-storied High-rise building of Sadharan Bima Corporation at Mokhali, Dhaka.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 12.00 Crores |
|
Design Completed
December 2016 |
18.50 Lakh |
Design Completed |
23 |
Consultancy Services for Construction of High-rise Building (10-storied) at the land of C.L Building of BIWTC, Khulna & Market/Shopping Complex and other structures at Bangabay land of BIWTC, Khulna.
|
BIWTC |
Construction of High-rise Building (10-storied) at the land of C.L Building of BIWTC, Khulna & Market/Shopping Complex and other structures at Bangabay land.
|
TS, ST, A, D, E/M, E/T, S
Design & Supervision |
Tk. 22.00 Crores |
|
Design Completed
December, 2017 |
23.0 Lakh |
Design Completed
|
Planning, Designing & Managing Construction of 20-storied Building with 3-Floor basement for Parking, Air-conditioning System, Lift-4Nos., Fire Fighting, Aluminum curtain wall & hall finishing with 950sqm. per floor.
Planning, designing, survey, soil-test, Architectural design & Interior Decoration, Structural design, Plumbing & Sanitary design, Electrical & Electro-Mechanical design, Preparation of estimate, Specification, Tender Document and Construction management, Construction supervision, Quality control, testing of materials, Payments certificate, Liaison with the authority, progress report etc. Over all responsibility of successful implementation of the project.
Planning, Designing & managing Construction of 13-storied Office Building (20- Storied Foundation) for BAPEX (Bapex Bhaban) with 2-Floor basement for Parking, Air-conditioning System, Lift - 4 Nos., Escalator - 2 pair, Fire Fighting, Aluminum curtain wall & high finishing.
Planning, designing, survey, Inventory, Architectural design, Structural design, Electro- Mechanical, fire- fighting, Plumbing & Sanitary etc. Preparation of estimate, Specification, Tender Document and Construction management, Construction supervision, Quality control, testing of materials, Payment certificate, Liaison with the authority, progress report etc. Overall responsibility of successful implementation of the project.
Planning, designing, survey, Inventory, Architectural design, Structural design, Plumbing & Sanitation design, Electrical & Electro-Mechanical design, Preparation of estimate, Specification, Tender Document and Construction management, Construction supervision, Quality control, testing of materials, Payment certificate, Liaison with the authority, progress report etc. Over all responsibility of successful implementation of the project. Construction Supervision 1st- Phase. 15- Storied Foundation + 2- Basement, Pile Foundation, MAT Service Pile, Short- Pile etc.Planning, Designing & managing Construction of 15- storied Office Building with 2- Floor basement for Parking, Air- conditioning System, Lift-4 nos. Fire Fighting, Aluminum curtain wall etc.
More..Planning, designing, survey, Inventory, Architectural design, Structural design, Plumbing & Sanitation design, Electrical & Electro-Mechanical design, Preparation of estimate, Specification, Tender Document and Construction management, Construction supervision, Quality control, testing of materials, Payment certificate, Liaison with the authority, progress report etc. Overall responsibility of successful implementation of the project. Construction Supervision Design & Supervision of 10- Storied Leadership Training Center Provided with IT Facilities, Training Hall, Computer Lab Library & IT Facilities Room Mat Foundation, 4- Lift, Sub- station, Generator, Fire-fighting CC TV, Air- Conditioning, Electro- Mechanical Works. at Cox\226\128\153s Bazar
More..