
Feasibility study, Detail Design & Construction Supervision of 800m3/ hour Water Treatment Plant, Sedimentation Basin, Production well, 7 Nos. Water Distribution pipe 20.50 KM, (250mm to 50 mm dia pipe), Pump house ending Electro-Mechanical Works, Generator, Transformer, (250KV), Land Development, Boundary Wall, Re-training Wall, 2- Storied Laboratory Building, & Dormitory Building etc.